This is a list of the Stage 2 works as listed by the RTA. All items other than the last two are in Ryde Council area,
the last two are in Hornsby. The RTA is fundung the councils for the work. $500,000 has been allocated for the works by thte RTA.
No timeframe has been given.
| Work to be done (summary) | Status |
Construction of a three (3) metre wide concrete shared use path
along the north western side of Delhi Road from Epping Road to the M2 westbound on-ramp
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Lane Cove Road and Talavera Road associated with the shared use crossing (lantern upgrade by RTA);
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Hitech Access Road and Talavera Road associated with the shared use crossing (lantern upgrade by RTA);
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Khartoum Road and Talavera Road associated with the shared use crossing (lantern upgrade by RTA);
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Macquarie Centre Access and Talavera Road associated with the shared use crossing (lantern upgrade by RTA);
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Herring Road and Talavera Road associated with the shared use crossing (lantern upgrade by RTA);
|
 |
Installation of 3.6 metre kerb ramps
at the intersection of Macquarie University entrance and Talavera Road/Christie Road associated with the shared use crossing;
|
 |
Traffic, bicycle and pedestrian management
along Vimiera Road from Marsfield Park to Epping Road
|
 |
Construction of a three (3) metre wide concrete shared use path
through Pembroke Park from Pembroke Road, Marsfield to Terrys Creek
|
 |
Design
of proposed shared use path along Talavera Road (missing sections)
|
 |
Design
of proposed shared use path along Culloden Road.
|
 |
Upgrade the existing shared use path facility at the south western corner
of the Epping Road/Pembroke Street intersection,
including associated kerb ramps and pathway staging/storage area.
|
 |
Construction of a three (3) metre wide concrete shared use path
from the
bridge over Terrys Creek to Pembroke Street
|
 |